Texas Basic Waste Water Operations Final Exam Review - Statistics

General Stats
  • This quiz has been taken 116 times
  • The average score is 17 of 30
Answer Stats
Question Answer % Correct
When an accidental discharge, bypass, or spill occurs, the discharger must notify the TCEQ within ________ hours. 24
91%
Each person contributes about ________ lbs of BOD daily. 0.17
88%
The primary purpose of returning sludge in the activated sludge process is to have enough ________ in the aeration basin to match the food supply. microorganisms
82%
A ladder must be within ________ feet of anyone in the trench. 25
79%
Protecting Texas water from contamination requires ________ of wastewater. all of the above
79%
The primary causes of wastewater stoppage are ________. roots and grease
79%
An administrative penalty for discharge violations can be up to ________ per day. $25,000
76%
An ultrasonic flow monitoring device works on the principle of ________. sonar
76%
Organic loading is the pounds per day of ________ per acre-feet or 1,000 cubic feet of media. BOD
68%
Examples of waterborne pathogens are ________. typhoid, cholera, and dysentery
68%
Excavations ________ feet or deeper should be shored, shielded, or sloped. 5
65%
The pH scale ranges from ________ to ________. 0/14
62%
A simple method of determining when to waste from an activated sludge plant is the ________. 30-minute settling test
62%
A weir is an obstruction placed in a channel causing the water to ________. back up
62%
Aerobic digestion is an ________ process whereby the aerobic bacteria consume themselves. endogenous
62%
When sludge in an Imhoff tank is near ________ inches of the slot, withdraw sludge. 18
56%
Examples of point source discharges are ________. municipal, industrial, and agricultural wastewater treatment facilities
56%
Imhoff tanks are ________ story units with ________ compartments. 2/3
53%
Ponding on a trickling filter is caused by ________. all of the above
53%
Organic loading of a stabilization pond is about ________ pounds of BOD/acre/day with a detention time of at least ________ days. 35/30
50%
In a well operated anaerobic digester, the methane gas content is about ________. 65-75%
50%
Gas chlorinator feed rates are indicated by the ________ in pounds per day. rotameter
50%
One surface acre of ponds provides treatment for about ________ people. 300
44%
When chlorine is used, the effective disinfectant is ________. HOCl
44%
How many square feet are in the end section of a 24-inch wastewater pipe? 3.14 square feet
38%
The most important problem prevented by monitoring or restricting industrial waste is ________. worker exposure
35%
A sedimentation tank is 80 feet long, 40 feet wide, and 16 feet deep. What is the detention time, in hours, at a flow rate of 1.8 MGD? 5.1 hours
29%
How many cubic yards of dirt are removed from a trench 600 feet long, 4 feet wide, and 8 feet deep? 711 cubic yards
29%
The normal operator controls on an activated sludge process are ________. RAS, WAS, and DO
29%
A wastewater treatment plant treats 1,800,000 gallons per day, using chlorine at 10 mg/L dosage. How many pounds of chlorine are used per day? 150 pounds
21%
No matching quizzes found
Score Distribution
Percent of People with Each Score
Percentile by Number Answered
Your Score History
You have not taken this quiz