| Answer | % Correct |
|---|---|
| 360° walkaround | 100%
|
| Adjust seat and work station | 0%
|
| Back drag-in float. Count from 1-100 to 3-1000, raise bucket at 4-1000 and again at 5-1000. | 0%
|
| Backfill trench | 0%
|
| Continue process until complete (park in open trench configuration) | 0%
|
| Dozer configuration when pushing from side (level-open-lower) 1/2" off ground | 0%
|
| Ensure bucket stays on ground-move forward between 1.5-2 pads | 0%
|
| Enter BHL and put on seatbelt | 0%
|
| Fully dump bucket and set dipper at 90° | 0%
|
| Fully extend boom, dipper, and bucket to make safety arc | 0%
|
| Lower boom until bucket teeth touch the ground | 0%
|
| Lower boom until slight lifting is felt | 0%
|
| Lower FEL until front wheels are 2" off ground | 0%
|
| Lower stabilizers-1800 RPMs | 0%
|
| Place spoil on uphill side of trench | 0%
|
| Push seat back and rotate | 0%
|
| Raise FEL and fully dump bucket | 0%
|
| Reconfigure BHL into travel configuration | 0%
|
| Reduce RPMs to 1200-alternate raising stabilizers 12'-raise FEL 12' | 0%
|
| Release boom and increase RPMs to 1800 | 0%
|
| Release parking brake | 0%
|
| Repeat process until required depth reached | 0%
|
| Reset-pull parking brake-fully dump and lower FEL | 0%
|
| Scraper configuration | 0%
|
| Set bucket at 30° angle and make marking cut | 0%
|
| Set RPMs to 1200 and lower stabilizers until level with front | 0%
|
| Set up for pushoff | 0%
|
| Slowly push off with dipper | 0%
|
| Start engine | 0%
|
| Turn on pilot control switch | 0%
|