Statutory Documentation - Statistics

General Stats
  • This quiz has been taken 26 times
    14 since last reset
  • The average score is 9 of 15
Answer Stats
Question Answer % Correct
Submitted by contractor Construction phase plan
100%
HSE provides F10 as a way to submit Notification
100%
All information the person making it has about the site is in this Pre construction information
100%
Includes site rules and inductions Construction phase plan
86%
Residual hazards and hazardous material after construction Health and safety file
86%
As built drawings of the structure Health and safety file
71%
NOT needed for every project Notification
71%
Includes risk assessments and method statements Construction phase plan
57%
Includes fire and emergency procedures Construction phase plan
43%
Submitted by designer Health and safety file
43%
Includes estimation of max number of people on site at any one time Notification
43%
Includes health and safety file Construction phase plan
29%
Usually submitted by client (someone else can do it for them) Notification
29%
DOESNT include a brief description of the project Pre construction information
29%
ALWAYS submitted by client Pre construction information
14%