| Question | Answer | % Correct |
|---|---|---|
| Submitted by contractor | Construction phase plan | 100%
|
| HSE provides F10 as a way to submit | Notification | 100%
|
| All information the person making it has about the site is in this | Pre construction information | 100%
|
| Includes site rules and inductions | Construction phase plan | 86%
|
| Residual hazards and hazardous material after construction | Health and safety file | 86%
|
| As built drawings of the structure | Health and safety file | 71%
|
| NOT needed for every project | Notification | 71%
|
| Includes risk assessments and method statements | Construction phase plan | 57%
|
| Includes fire and emergency procedures | Construction phase plan | 43%
|
| Submitted by designer | Health and safety file | 43%
|
| Includes estimation of max number of people on site at any one time | Notification | 43%
|
| Includes health and safety file | Construction phase plan | 29%
|
| Usually submitted by client (someone else can do it for them) | Notification | 29%
|
| DOESNT include a brief description of the project | Pre construction information | 29%
|
| ALWAYS submitted by client | Pre construction information | 14%
|