1. ALWAYS submitted by client
2. Usually submitted by client (someone else can do it for them)
3. Submitted by contractor
5. NOT needed for every project
6. Includes estimation of max number of people on site at any one time
7. HSE provides F10 as a way to submit
8. All information the person making it has about the site is in this
9. Includes site rules and inductions
10. Includes health and safety file
11. Includes risk assessments and method statements
12. Includes fire and emergency procedures
13. DOESNT include a brief description of the project
14. As built drawings of the structure
15. Residual hazards and hazardous material after construction